Construction Panel Projects

Duration: March - July 2014

Details: Accessibility Improvement Works at the intersection of

  • Victoria Square & Victoria Avenue;

  • Hay Street & King Street;

  • James Street & Pier Street; 

Scope included:

  • Removal of existing pram ramps;

  • Construction & Installation of new pram ramps; and

  • Reinstatement of footpath and roadside kerbs

 

Duration: February 2014

Details: Removal of existing asphalt up to 100mm thickness and Installation of pavers for the Moore Street Median Strip

 

Duration: February 2014

Details: Civil works at the intersection of Pier Street & Moore Street

Scope included:

  • Removal of existing slabs, kerbs and concrete base to 100mm thickness;

  • Construction and installation of pram ramps and kerbs;

  • Supply and lay of paving; and

  • Supply and lay of asphalt

 

Duration: January 2014

Details: Redevelopment works at the intersection of Francis Street & William Street and James Street & William Street

Scope included:

  • Removal of existing slabs, kerbs and concrete base to 100mm thickness;

  • Construction and installation of pram ramps and kerbs; and

  • Supply and lay of asphalt

 

Duration: November 2013

Details: BOS Civil were contracted to complete the DFES Hydrant Valve Pit Repair at Murray St Mall

 

    

Duration: November 2013

Details: BOS Civil were contracted to remove the existing kerb and verge at Thomas Street, lay foundation limestone and install new kerbing.

 

Duration: July 2014

Details: BOS Civil were contracted to install these artist designed Urban Furniture on William Street in Perth. This work included excavating and pouring of concrete footings, installation of chemical anchored bolts, installation of furniture and electrical lighting and reinstatement of paving.

Duration: July 2014
Details: BOS Civil were contracted to make modifications to the intersection of Wellington and Havelock Street.

Scope included:

  • Removal of existing pram ramps and footpath

  • Pour new pram ramps and footpath 

  • Widening of road section

  • Installation of new gully and manhole

  • Modification to median

  • Turf reinstatement

 

Duration: June 2014
Details: BOS Civil were contracted to make modifications to the intersection of Wellington and Lord Street.

Scope included:

  • Removal of existing pram ramps and footpath

  • Pour new pram ramps and footpath 

  • Widening of road section

  • Modifications to median